Range Road 210, from Township Road 550 to Highway 15 will be upgraded to a Class II road to improve the safety and sustainability of the roadway and to support traffic volume.Â
The upgrades include:Â
- Widening the current 6-6.5m roadway to a 7.5m roadwayÂ
- Improving the roadway to an asphalt surfaceÂ
- Providing gentler ditch side slopes, where possibleÂ
- Replacing the bridge just north of TWP Road 550
Project timeline
2024 update
The project is now substantially complete and the roadway is fully open for travel.
Remaining work includes:
- From Township Road 550 to 552
- Roadway deficiency repairs
- Minor ditch clean up and grading work
Â
- From Township Road 550 to Highway 15
- Relocation of Fortis poles and ditch clean up once relocated
Project contacts:
Transportation Engineering and Operations
Phone: 780-417-7100
Submit a request related to road construction
Consultant:
Fred Greenhough, Manager
Al-Terra Engineering Ltd.
780-577-4305
FDG@al-terra.com